Donation Tracker

Wall Construction
For security reasons, the Centre has to replace the existing palisade fencing with a solid wall as there have been numerous break-ins with repairs being undertaken each time at considerable cost.
A 245m wall alongside the N2 highway only will cost approximately R2million. This includes all material and building costs. A humble appeal is made to you to contribute towards this Project.
Donation Tracker
0.05% Raised
R1,015.00 donated
1 Donor
XX Days Left